New window installed in a wood-framed wall with spray foam around the frame and membrane at the opening

Say it like this

Talk the way you would to a colleague on site. Below each recording is the note Neuveria writes from it. You review and edit every note before the report goes out.

Window installed

You say

“Window W zero six at the rear, installed, level and plumb, shims at the jambs. Spray foam all around the frame, about an inch gap. Membrane wraps into the rough opening and the sill pan is in.”

Neuveria writes

Window W06 at the rear was installed level and plumb, with shims at the jambs. Spray foam was installed around the entire frame within an approximately 25 mm (1") gap. The membrane wrapped into the rough opening, and the sill pan was installed.

Head lap and back dam

You say

“Window W zero four, there's no back dam on the sill pan and the membrane at the head isn't lapped over the window flange, it's tucked under it. That's non-compliant with the details on A five oh one. Contractor to redo the head lap and add the back dam before cladding.”

Neuveria writesNon-compliant

At window W04, no back dam was provided at the sill pan. The membrane at the head was not lapped over the window flange but was tucked beneath it. This installation did not comply with the details on A501. The contractor is to rectify the head lap and add the back dam before cladding installation.