Shoring in place
“P one, grid lines D to F, three to five. Shoring is in per the shoring drawings, revision two. Post shores at about four feet each way, frames along the ramp edge. Base plates are all on the slab and the heads are tight. Shoring engineer's letter is on site.”
At Level P1, between grid lines D and F and 3 and 5, shoring was installed in accordance with the shoring drawings, Revision 2. Post shores were spaced at approximately 1.22 m (4'-0") each way, with frames installed along the ramp edge. All base plates were supported on the slab, and the heads were tight. The shoring engineer’s letter was available on site.