You say

“P one, grid lines D to F, three to five. Shoring is in per the shoring drawings, revision two. Post shores at about four feet each way, frames along the ramp edge. Base plates are all on the slab and the heads are tight. Shoring engineer's letter is on site.”

Neuveria writes

At Level P1, between grid lines D and F and 3 and 5, shoring was installed in accordance with the shoring drawings, Revision 2. Post shores were spaced at approximately 1.22 m (4'-0") each way, with frames installed along the ramp edge. All base plates were supported on the slab, and the heads were tight. The shoring engineer’s letter was available on site.

Loose shores

You say

“Two posts at E four aren't tight, there's about a three-eighths of an inch gap at the head, and one base plate is sitting on a chunk of broken concrete. This is outstanding. Contractor to fix it today, before any more removals up top.”

Neuveria writesOutstanding

Two posts at grid E4 were not tight, with an approximately 10 mm (3/8") gap at the head. One base plate was bearing on a piece of broken concrete. This work remains outstanding. The contractor is to rectify these items on the day of the review, before any further removals above.