Guide Framing

Framing

What to say when you review floor framing, beams and hangers.

Second floor joists on hangers at a new steel beam with temporary wood shoring below

Say it like this

Talk the way you would to a colleague on site. Below each recording is the note Neuveria writes from it. You review and edit every note before the report goes out.

Floor framing at the beam

You say

“Rear addition, second floor framing. Steel beam is in, joists are on face-mount hangers at sixteen inches on centre. Temporary shoring is still under the beam. Floor sheathing is three-quarter inch, glued and screwed.”

Neuveria writes

The second-floor framing at the rear addition was reviewed. The steel beam was installed, and the joists were supported on face-mount hangers at 405 mm (16") on centre. Temporary shoring remained in place beneath the beam. The floor sheathing was 19 mm (3/4"), glued and screwed.

Hangers and a notch

You say

“Two hangers at the north end are missing nails, and one joist is notched about two inches at the bottom near the beam. This is outstanding. Contractor to fill the hangers and get the framing engineer to review the notch before the shoring comes out.”

Neuveria writesOutstanding

Two hangers at the north end were missing nails, and one joist was notched approximately 50 mm (2") at the bottom near the beam. These items remain outstanding. The contractor is to install the missing hanger nails and have the framing engineer review the notch before the shoring is removed.

See it with your own projects

A 20-minute call where we walk through a real report from start to finish, or watch the 13-minute video first.

Book a demo