Guide Concrete pour

Concrete pour

What to say when you review a concrete pour: the mix, placement, testing, finishing and curing.

Concrete pump boom over foundation footing forms during a pour, seen from above

Say it like this

Talk the way you would to a colleague on site. Below each recording is the note Neuveria writes from it. You review and edit every note before the report goes out.

Pump and placement

You say

“Pour on the main floor slab today, about forty-five cubes of thirty-two MPa with five to eight percent air. Pump truck set up on the street side. They started at seven thirty and finished around eleven. Placed in two lifts, vibrated well. Slump at the truck was about four inches.”

Neuveria writes

The main floor slab was poured on the day of the review using approximately 45 m³ (59 cu. yd.) of 32 MPa (4,600 psi) concrete with 5% to 8% air. The pump truck was set up on the street side. Placement commenced at 7:30 a.m. and was completed at approximately 11:00 a.m. The concrete was placed in two lifts and was well vibrated. Slump at the truck was approximately 100 mm (4").

Water added at the truck

You say

“Second truck, the driver added water at the chute without asking, maybe twenty litres. Slump went to about six inches. We told them to stop adding water. Testing company took an extra set of cylinders from that truck. Contractor to send the batch ticket.”

Neuveria writes

At the second truck, the driver added approximately 20 L (5 gal.) of water at the chute without requesting authorization. The slump increased to approximately 150 mm (6"). We instructed the driver to stop adding water. The testing company took an additional set of cylinders from that truck. The contractor is to provide the batch ticket.

Finishing and curing

You say

“Slab was power troweled by about two in the afternoon. Saw cuts at around twelve feet each way, to be done within twenty-four hours. Curing compound is on site but not applied yet. Contractor to apply it today and keep the slab covered if it drops below five degrees tonight.”

Neuveria writes

The slab was power-trowelled by approximately 2:00 p.m. Saw cuts at approximately 3.7 m (12'-0") in each direction are to be completed within 24 hours. The curing compound was on site but had not yet been applied. The contractor is to apply the curing compound on the day of the review and keep the slab covered if the temperature drops below 5°C (41°F) overnight.