Unit delivered
“New chiller delivered at the loading dock, Carrier AquaSnap, sitting on wood skids. Tarp is partly covering it. The piping connections are capped and the nameplate is readable.”
The new Carrier AquaSnap chiller was delivered to the loading dock and was resting on wood skids. A tarp partially covered the chiller. The piping connections were capped, and the nameplate was legible.