What to say when you review the drainage membrane, weeping tile and stone before backfill.

Dimple drainage membrane and clear stone along a concrete foundation wall before backfill

Say it like this

Talk the way you would to a colleague on site. Below each recording is the note Neuveria writes from it. You review and edit every note before the report goes out.

Membrane and weeping tile

You say

“East foundation wall, the dimple membrane is on with the plastic washers at about sixteen inches, laps about six inches at the corners. Weeping tile is in with the sock, and there's three-quarter inch clear stone about a foot over it.”

Neuveria writes

At the east foundation wall, the dimple membrane was installed with plastic washers spaced approximately 405 mm (16") apart and with laps of approximately 150 mm (6") at the corners. The weeping tile was installed with the sock and covered with approximately 0.30 m (1'-0") of 20 mm (3/4") clear stone.

Open risers and a tear

You say

“Two of the drain risers along the east side are still open at the top, and the membrane is torn about two feet long near the window well. This is outstanding. Contractor to cap the risers and patch the tear before backfill.”

Neuveria writesOutstanding

Two drain risers along the east side remained open at the top, and an approximately 0.61 m (2'-0") long tear was observed in the membrane near the window well. This work remains outstanding. The contractor is to cap the risers and repair the tear before backfilling.

See it with your own projects

A 20-minute call where we walk through a real report from start to finish, or watch the 13-minute video first.

Book a demo