Before the pour
“East side footings, grid lines one to four. Forms are set, footing's two feet wide by a foot deep, matches the drawings. Two fifteen M bars continuous, laps about two feet, chairs are in. Bottom's clean, undisturbed native soil, no standing water. Good to pour once the geotech signs off on bearing.”
The east side footings at grid lines 1 to 4 were reviewed. The forms were set, and the footings were 0.61 m (2'-0") wide by 0.30 m (1'-0") deep, consistent with the drawings. Two continuous 15M bars were installed with laps of approximately 0.61 m (2'-0") and supported on chairs. The footing bottoms were clean and consisted of undisturbed native soil, with no standing water observed. Concrete placement may proceed once the geotechnical consultant approves the bearing conditions.