Guide Footings

Footings

What to say when you review footings before and during the pour, and the notes Neuveria writes from it.

Aerial view of footing formwork and reinforcing steel on a residential foundation, with a concrete pump boom

Say it like this

Talk the way you would to a colleague on site. Below each recording is the note Neuveria writes from it. You review and edit every note before the report goes out.

Before the pour

You say

“East side footings, grid lines one to four. Forms are set, footing's two feet wide by a foot deep, matches the drawings. Two fifteen M bars continuous, laps about two feet, chairs are in. Bottom's clean, undisturbed native soil, no standing water. Good to pour once the geotech signs off on bearing.”

Neuveria writes

The east side footings at grid lines 1 to 4 were reviewed. The forms were set, and the footings were 0.61 m (2'-0") wide by 0.30 m (1'-0") deep, consistent with the drawings. Two continuous 15M bars were installed with laps of approximately 0.61 m (2'-0") and supported on chairs. The footing bottoms were clean and consisted of undisturbed native soil, with no standing water observed. Concrete placement may proceed once the geotechnical consultant approves the bearing conditions.

Cover too small

You say

“Pad footing at C three, about five feet square, eighteen inches deep. Bottom mat is fifteen M at twelve inches each way, but at the north edge the bars are basically sitting on the soil, maybe an inch of cover. Contractor to add chairs and get three inches of cover before the pour.”

Neuveria writes

The pad footing at C3 was approximately 1.52 m (5'-0") square and 455 mm (18") deep. The bottom mat consisted of 15M bars at 305 mm (12") each way; however, at the north edge, the bars were resting on the soil, providing approximately 25 mm (1") of cover. The contractor is to add chairs and provide 75 mm (3") of cover before the concrete pour.

Cold weather pour

You say

“Pour today at the west footings, thirty-two MPa, about eighteen cubes. It was minus two this morning. Blankets are on site, they're tenting and heating. Slump came in around three inches, two sets of cylinders taken.”

Neuveria writes

Concrete was poured at the west footings on the day of the review. The concrete strength was 32 MPa (4,600 psi), and the volume was approximately 18 m³ (24 cu. yd.). The temperature was -2°C (28°F) in the morning. Blankets were on site, and tenting and heating were in progress. The slump was approximately 75 mm (3"), and two sets of cylinders were taken.