Guide Demolition

Demolition

What to say when you review demolition progress, bracing, debris and site safety.

Partial demolition of a brick house with a skid steer loading debris on site

Say it like this

Talk the way you would to a colleague on site. Below each recording is the note Neuveria writes from it. You review and edit every note before the report goes out.

Progress

You say

“Demolition at the rear of the house is underway. The brick walls are down on the north side, and the roof framing is still up and braced at the front. The skid steer is loading debris into the bin, about two bins out so far. Site fencing is up on all sides.”

Neuveria writes

Demolition at the rear of the house was underway. The brick walls on the north side had been removed, while the roof framing remained in place and was braced at the front. The skid steer was loading debris into the bin, with approximately two bins removed from the site at the time of the review. Site fencing was in place on all sides.

Dust and hoarding

You say

“On the neighbour's side they're demolishing within about three feet of the property line with no dust control, no water, and the hoarding is open at the gate. That's non-compliant with the demolition plan. Contractor to wet it down, close the hoarding and keep the gate locked when no one's there.”

Neuveria writesNon-compliant

On the side facing the neighbouring property, demolition was occurring within approximately 0.91 m (3'-0") of the property line, with no dust control or water in use, and the hoarding gate was open. This was not compliant with the demolition plan. The contractor is to wet down the demolition area, close the hoarding, and keep the gate locked when the site is unattended.